Fireside chat – The industrialised AI buildout
Prefabricated and modular construction can reduce data centre delivery timelines by 30-50%. This fireside explores where industrialisation accelerates delivery and where risk is shifted.
- What should be assembled off-site vs site built?
- Where does modular builds reduce schedule risk vs transferring risk?
- What must be frozen before long-lead packages and modules are released?