1. 03-Jun-2027
    In data centres, BESS has traditionally served as passive backup infrastructure. AI workload volatility, grid constrains and changing energy strategies are now driving its evolution into a more flexible, grid-interactive asset.
  2. 03-Jun-2027

    As AI workloads become unpredictable, they drive demand for flexible power infrastructure. This session will explore how operators can maximise ROI, select the right battery technologies, and integrate storage into long-term power strategies.

  3. 03-Jun-2027

    As AI workloads drive sharper power peaks, battery storage unlocks resilience and revenue. This panel examines the commercial models, technology choices, and system integration required to scale BESS as strategic infrastructure.

  4. 03-Jun-2027

    Delegates will join a moderated table of up to ten participants for a focused 45-minute discussion. Each moderator will then share the table’s principal conclusions with the wider Forum. A happy hour will run alongside the session.