Salon Croisette04-Jun-2026
-
Salon Croisette04-Jun-2026What evidence is required for a credible nuclear-for-AI project (grid-connected and behind-the-meter), and what can hyperscalers share.
-
Salon Croisette04-Jun-2026Translate the Evidence Pack into what lenders/insurers require; address the PPA horizon mismatch and BTM route-to-market risk.
-
Salon Croisette04-Jun-2026Realistic capacity coming online; what demand signals, policies, and contracting structures move the needle.
-
Salon Croisette04-Jun-2026Where projects slip: long-lead electrical equipment, component qualification, EPC capacity, and commissioning/testing capability.
-
Salon Croisette04-Jun-2026
-
Salle de Presse04-Jun-2026
-
Salle de Presse04-Jun-2026Grid-connected vs behind-the-meter vs hybrid as contracting structures (counterparty risk, fallback options, reliability specs, curtailment).
-
Salle de Presse04-Jun-2026PPA term structures, risk-sharing clauses, insurance, and who can carry construction-period risk.
-
Coffee BreakSalle de Presse04-Jun-2026
-
Salle de Presse04-Jun-2026What can scale in the next 36 months (uprates, brownfield restarts, grid upgrades, transitional solutions) while new nuclear ramps.
-
Salle de Presse04-Jun-2026Permitting, licensing, interconnection process, and targeted interventions (US vs Europe).
-
Salle de Presse04-Jun-2026