Nuclear for AI Summit

Loading
  1. Salon Croisette
    04-Jun-2026
  2. Salon Croisette
    04-Jun-2026
    What evidence is required for a credible nuclear-for-AI project (grid-connected and behind-the-meter), and what can hyperscalers share.
  3. Salon Croisette
    04-Jun-2026
    Translate the Evidence Pack into what lenders/insurers require; address the PPA horizon mismatch and BTM route-to-market risk.
  4. Salon Croisette
    04-Jun-2026
    Realistic capacity coming online; what demand signals, policies, and contracting structures move the needle.
  5. Salon Croisette
    04-Jun-2026
    Where projects slip: long-lead electrical equipment, component qualification, EPC capacity, and commissioning/testing capability.
  6. Salon Croisette
    04-Jun-2026
  7. Salle de Presse
    04-Jun-2026
  8. Salle de Presse
    04-Jun-2026
    Grid-connected vs behind-the-meter vs hybrid as contracting structures (counterparty risk, fallback options, reliability specs, curtailment). 
  9. Salle de Presse
    04-Jun-2026
    PPA term structures, risk-sharing clauses, insurance, and who can carry construction-period risk.
  10. Coffee Break
    Salle de Presse
    04-Jun-2026
  11. Salle de Presse
    04-Jun-2026
    What can scale in the next 36 months (uprates, brownfield restarts, grid upgrades, transitional solutions) while new nuclear ramps.
  12. Salle de Presse
    04-Jun-2026
    Permitting, licensing, interconnection process, and targeted interventions (US vs Europe).
  13. Salle de Presse
    04-Jun-2026